法我 Remediation

Faro, Yukon, 加拿大

Filter projects by:

市场

  • 城市

  • 商业 & 住宅

    混合使用

  • 教育

    大学 & 大学

    学校

  • 能源

    Carbon capture, utilization and storage

    地热

    Grid Modernization

    水力发电

    Microgrids and energy storage

    海上风力发电

    Portfolio Decarbonization and Climate Resilience

    太阳能

    运输 decarbonization

  • 政府

  • 医疗保健

    Clinical Hospital

    生命科学

    高级的生活

  • 工业

    Agriculture, Food & 饮料

    汽车 & 重型设备 & 机械

    制造业

    矿业 & 金属

    Pharmaceutical/Specialty 化学物质

    纸浆 & 纸

  • 正义

  • 休闲

    Themed Entertainment and Mixed-Use

  • 石油、天然气 & 化学物质

    Chemical/Petrochemical

    下游

    中游

    上游

  • Sports and Venues

  • 运输

    航空

    桥梁

    货运铁路

    高速公路 & 道路

    Intelligent 运输 Systems

    公共交通

    港口 & 海洋

    隧道

  • 大坝 & 水电

    工业 水

    市政水

    隧道, Conveyance, Collection & 分布

    Waste水 Treatment & 重用

    水处理

    水shed and Ecosystem Management

服务

  • Alternative Delivery Models

  • 体系结构 and 设计

    体系结构

    Urbanism + Planning

  • Asset Management

  • 城市 Solutions

  • Construction Management

  • 成本管理

  • 经济学

  • 工程

  • Environmental 服务

    Air Quality Consulting and 工程

    Climate Adaptation

    EHS Management Consulting and 合规

    Environmental/Social Impact Assessment and Permitting

    Management Information Systems (MIS)

    Remediation, Restoration and Redevelopment

  • Forestry, Geomatics and Remote Sensing

  • Geotechnical 服务

  • International Development

  • IT and Cybersecurity

  • Mobilitics

  • Multinational Investment and Development

  • Operations and Maintenance

  • Pedestrian Modelling (North America)

  • Planning and Consulting

    Geospatial 服务

  • Process Development & 实现

  • Program Management

  • Public-Private Partnerships

  • Rail Simulations

  • Strategic Consulting

Once the largest open pit lead-zinc mine in the world, 法我 is now the site of one of the most complex abandoned mine remediation projects in 加拿大. The 25 square kilometre mine site located in south-central Yukon on traditional territory of KaskaNations was abandoned in 1998 and has since been in care and maintenance. 

Our team has been involved in the site remediation since 2007. Initially in a subconsultant role, we supported the regulatory process through environmental assessments, 水文地质, aquatic field programs, 鱼 and 鱼 habitat studies, strategic 鱼eries advice, environmental monitoring, and environmental audits. We also helped mitigate imminent environmental damage through permitting support for urgent works tasks.  

Our socioeconomic team compiled previous consultation information, and developed a socioeconomic management and monitoring plan to provide guidance on delivering mitigation measures. The plan intended to maximize benefits for local area residents while advancing the design of the project.  

In 2022, we were contracted by Public 服务 and Procurement 加拿大 on behalf of Crown-Indigenous Relations and Northern Aff空气s 加拿大 to lead the team developing the remediation plan design and quality assurance support services. This includes tracking and replying to inquiries and developing the detailed design and tendering for remediation works. 

Along with our partners, we are providing engineering services for an overall “stabilize-in-place” remediation approach, including decommissioning, removing mine infrastructure, and managing contaminated and treated 水.  

The project’s key objectives are to protect human health and safety; safeguard the environment, 包括土地, 空气, 水, 鱼, and wildlife; maximize local and Yukon socioeconomic benefits; manage long-term site risk in a cost-effective manner; and return the mine site to an acceptable state of use that reflects pre-mine land use, 在可能的情况下. This work is being performed with the support of the Ross River Dena Council, allowing us to continue to provide Indigenous opportunities and initiatives to the community. 

  • Consulting Engineers of Alberta Showcase 奖, Award of Merit, Environmental, 2020